Apollo 12
..
USS Hassayampa  AO-145
was there in support of the task forcee.
..............................................................................
Link to Photos
Launch took place under cloudy, rain-swept skies on Saturn V SA-507 on 14 November 1969 at 16:22:00 UT (11:22:00 a.m. EST) from Pad 39A at Kennedy Space Center. The spacecraft was struck by lightning 36 seconds after launch and again 52 seconds after launch, which momentarily shut off electrical power and cut out telemetry contact. Power was automatically switched to battery backup while the crew resored the primary power system. 

There were no further problems with the power system and the spacecraft entered planned Earth parking orbit at 11 minutes 44 seconds after liftoff. After 1 1/2 orbits the S-IVB stage was re-ignited at 19:15:14 UT for a translunar injection burn of 5 min. 45 sec. putting the spacecraft on course for the Moon. The CSM separated from the S-IVB stage containing the LM 25 minutes later, turned around and docked with the LM at 19:48:53 UT. The S-IVB stage was then jettisoned into Earth orbit instead of planned heliocentric orbit due to error in the instrument unit. During lunar coast, the LM was checked out to ensure no electrical damage had been caused by the lightning.

A midcourse correction was made on 16 November at 02:15 UT. A six minute SPS burn on 18 November at 03:47:23 UT put the Apollo 12 into lunar orbit. Two orbits later a second burn circularized the orbit. Conrad and Bean entered the LM and it separated from the CSM at 04:16:03 UT on 19 November. The LM descent engine fired for 29 seconds at 05:47 UT, and the LM landed in Oceanus Procellarum near the rim of Surveyor crater at 06:54:35 UT. Conrad and Bean performed two surface EVA's, one on 19 November and one on 20 November, during which an Apollo lunar surface experiments package (ALSEP) was placed on the lunar surface, 34.4 kg of samples of the lunar terrain were acquired, various photographs were exposed by the astronauts during lunar surface activities, and parts were taken from the Surveyor 3 spacecraft for examination.

The LM lifted off from the Moon on 20 November at 14:25:47 UT after 31 hours 31 minutes on the lunar surface. After docking with the CSM at 17:58:22 UT, the LM was jettisoned at 20:21:30 and intentionally crashed into the Moon creating the first recorded artificial moonquake. Transearth injection began at 20:49:16 UT on 21 November with a firing of the CSM main engine. A mid-course correction was made on 22 November. The CM separated from the SM on 24 November at 20:29:21. Apollo 12 splashed down in the Pacific Ocean on 24 November 1969 at 20:58:24 UT (3:58:24 p.m. EST) after a mission elapsed time of 244 hrs, 36 mins, 24 secs. The splashdown point was 15 deg 47 min S, 165 deg 9 min W, near American Samoa and 6.9 km (4.3 mi) from the recovery ship USS Hornet.

SOURCE.........................Go To Hassayampa Page